B.L. SINGHANIA APARTMENT
The large spacious drawing room here exudes class and the adjoining dining area, large enough to host a sit-down dinner, flaunts an unparallel style. Casting a magic spell of complete comfort are the lavish bedrooms with nature-inviting balconies. Nothing equals the luxuriousness of Edifice where your search for a perfect dream home ends here.
RERA No: BRERAP00055-2/575/R-454/2019
- Elevation
- Specification
- Floor Plan
- Car Parking
- Location Map
- Payment Plan
|
1. |
17 Years maintenance free (On payment of Rs 2 Lakh) |
2. |
Two lift facility Round O Clock |
3. |
24 Hour Security |
4. |
Provision of Intercom Facilities |
5. |
Round the Clock Power Backup |
6. |
Stainless steel railing in stairs & balcony |
|
Foundation |
- |
Pile structure with earthquake resistant design. |
Structure |
- |
R.C.C. framed with 10' external & 5" internal AAC/Brick Wall. |
Steel |
- |
SAIL, TATA, MONNET, RINL, JINDAL or equivalant. |
Cement |
- |
Lafarge, Ultratech, ACC or equivalant. |
External Wall |
- |
Weather coat paint of Dulux or Nerolac above two coats of putty. |
Internal Wall |
- |
All wall and ceiling will be finished with plaster and double coat of wall putty & plastic paint. |
Flooring |
- |
Vitrified Tiles of RAK/ Kajaria/ Somany or equivalent. |
Window |
- |
Powder coated Aluminium Window/ UPVC windows with safety grills. |
Kitchen |
- |
Granite top cooking platform with SS sink. |
Door |
- |
1. Chaukhat:- Hard Wood 2. Door:- Flush door of ISI mark with Mica top
Decorative main door with SS lock of Godrej.
|
Bathroom |
- |
1. DADO up to 7' height. 2. Sanitary:- Kohler/Hindware or Parryware 3. Bath Fittings:- Kohler/Jaguar or Marc |
Electric Wiring |
- |
Concealed copper wire of ISI make. |
TV/Cable point |
- |
Provision in Master Bed Room & Drawing Room. |
Parking |
- |
Mosaic Tiles/ Mosaic Kalezi/ checker tiles flooring |
At the time of booking & Registration |
20% of unit cost |
At the time of Completion of foundation. |
10% of unit cost |
At the time of 1st Floor Roof Slab Casting. |
10% of unit cost |
At the time of 3rd Floor Roof Slab Casting. |
10% of unit cost |
At the time of 5th Floor Roof Slab Casting |
10% of unit cost |
At the start of Brick work of respective floors |
10% of unit cost |
At the start of Plaster of respective floors |
10% of unit cost |
At the time of flooring fittings |
10% of unit cost |
At the time of posession & registry |
10% of unit cost |